Class I Deep Injection Well Surface Facilities

  • Engineering Design:

    • Low Pressure HDPE Piping System (Pump Intake)

    • High Pressure Stainless Steel Piping System per ASME B31.3 (Pump Discharge), Including Flexibility and Support Analysis Modeling

    • Wastewater Storage/Surge Tank System, Flow Controls, and Concrete Containment

    • Integration with Custom-Made Horizontal, High Pressure Centrifugal Pumps

    • Concrete Foundations for Custom Horizontal Pumps

    • Plans, Details, Isometrics, P&ID's, Specifications & Bill of Materials

  • Material Procurement for Piping, Fittings, Valves, Instrumentation and Controls, Well Head, Pressure and Flow Monitoring System, and Other Associated Equipment

  • Coordination and Oversight of Site Construction, Piping System Installation, and System Startup

  • Design and Installation Performed Under Tight Deadlines in a Highly Congested Area of a Coal Mine Requiring Coordination with Multiple Contractors Including:

    • Civil Site Contractor,

    • Pipe Fitters,

    • Electrical Contractors,

    • Chemical Feed System Supplier,

    • Horizontal Pump Installer,

    • Well Head Installer, and

    • Instrumentation/Controls Installer

  • Project was Critical to Prevent Shutting Down Operations Due to Regulatory Non-Compliance, Making it Extremely High Priority with Minimal Time to Complete. Successfully Completed in Time to Allow Operations to Continue Without Interruption